Addenda Synergy
List of Projects

- Construction and installation of 950m Citadel Perimeter high security fence at Cavisa Design Facility in Ikeja, Lagos state.

- Construction of 1000m Citadel security fence at Wells Hosa Greenhouse farms Ltd in Benin bypass, Edo State

- Construction of Estate Fence, Entrance Gate and Gate House (FGN II) at the proposed public servants Housing estate at Kuje, Abuja

- Cummins West Africa-Impro Access Control

- GTB Bank training school Abeokuta-Tesa Smartair wireless access control

- Mobil Oil/Waka Office-HID reader/Traka key management, Abloy locks

- Abuja Clinic-Maitama Abuja-ASSA abloy TESA smartair wireless access control

- Consultancy Services for the Engineering Design of Dirin Daji to Gelwasa 2KM Road in Kebbi/Niger State

- Construction of trans Amadi Gardens, Port Harcourt estate Roads for Federal Housing Authority

- Provided consultancy for reservoir management and depletion planning for FHN at OML 26.

- Supplied subsea equipment installation and maintenance expertise for SPDC at OML 20.

- Conducted training workshops for technical personnel on advanced drilling techniques for Oando PLC at OML 63.

- Developed access roads to remote well sites, ensuring seamless logistics for Alfa Designs Nigeria Limited at OML 34.

- Executed construction of modular field offices to enhance operational efficiency for ND Western at OML 34.

- Built reinforced culverts and drainage systems to mitigate flooding risks Neconde Energy at OML 42.

- Installed advanced C-Thru fencing systems with integrated surveillance technology around key operational areas of Heritage Oil at OML 30.

- Supplied drilling mud chemicals and additives for optimized drilling operations for Oando energy Resources at OML 60.

- Delivered specialized equipment for oil spill containment and recovery SNEPCO at OML 118.

- Executed front-end engineering design (FEED) for crude evacuation systems SPDC at OML 25.

- Designed and oversaw the installation of fire suppression systems for onshore facilities for Navante Oil & Gas Limited at OML 119.

- Designed waste management systems to handle hazardous by-products efficiently for Seplat Energy at OML 53.

- Implemented air quality monitoring systems to track emissions from flaring operations for Alfa Designs Nigeria Ltd at OML 34.